Separate wireless problems a survey will actually fix from ones it won't, then gather the full site brief so a heatmap/site survey can be commissioned in one pass.
1. Qualify first — a survey is warranted when the problem is coverage/capacity/interference or a greenfield design; it is often NOT the right first step when the cause is a config issue, a single failing AP, a WAN/circuit problem, or a client-device issue. Sanity-check current infrastructure via the wifi-infrastructure-audit skill and the RMM/documentation before recommending a survey, so you don't commission one for a problem a config fix would solve.
2. Pick the survey type: predictive (from floor plans, for design/new-build), passive (measure existing RF for coverage), or active (throughput/roaming validation). State which fits the stated goal and why.
3. Capture the site-info checklist needed to commission the survey — mark each item captured / missing:
- Site: address, floors/areas in scope, approximate square footage, and a floor plan (to scale if predictive).
- Environment: building construction (drywall vs concrete/brick, warehouse racking, cold storage), ceiling height, known RF challenges.
- Requirements: expected client count and device types, high-density areas, coverage-critical zones (VoIP/handhelds/video), outdoor/warehouse coverage needs.
- Existing WLAN: vendor/controller, AP models and count, current SSIDs and bands, mounting.
- Access & logistics: point of contact, site access/escort, hours, and any areas requiring special access.
4. Note environmental constraints that change the survey (occupied vs empty building, seasonal stock levels in a warehouse) since they affect measured RF and when the survey should run.
5. Produce the survey request brief: recommendation (survey yes/no and type), the completed site-info checklist with any missing items called out, and the scope. If a site visit is needed, offer to open a scheduling request (requires TimeZest; if absent, skip and note the visit must be booked manually). Leave the brief as a plain-text note (no markdown/emojis) or open a ticket for the survey engagement.
Guardrails: don't commission a survey by default — if the evidence points to config, a single AP, or a WAN problem, say so and route to the appropriate skill instead. A brief with missing checklist items must ship with those gaps flagged, not filled with assumptions about the site. This skill produces a request/brief and can open a scheduling request; it does not dispatch a technician or commit a survey date without the scheduling step. Do not invent floor plans, square footage, or AP counts — mark them missing when unknown.